R6m 2strands billets CCM
Billet specification: 100*100,125*125,130*130, 150*150mm
Strand number: strands 2 strands
Dummy bar: rigid dummy bar
Ladle support: Ladle Rotor Tower/Ladle moving car
R6m, 2strands, 6-12meter billets
Design according ITALY technology,Italy CCM OEM factory.
Biggest CCM factory with 1000worker 30 years in china.
NO: R62T12
Design according ITALY technology,Italy CCM OEM factory.
R9 meter 2 strdans Iran project ,Accept KUNLUN bank payment.
We have many other R8m R6 meter ,R4 meter CCM project in iran .
We also have 20ton furnace, 30ton ,50tonfurnace,5ton furnace project in iran
Ⅰ. Technical data
1. CCM
Casting radius: R6m
Billet specification: 100*100,125*125,130*130, 150*150mm
Strand number: strands 2 strands
Dummy bar: rigid dummy bar
Ladle support: Ladle Rotor Tower/Ladle moving car
Cutting way: automatic hydraulic cutting machines/Flame cutting machine
Electrical system: SIEMENS/DELTA Transducer, SIEMENS/DELTA PLC, SCHNEIDER contactors . PLC automatic controlling
Steel grader Q215,Q235,20MnSi,45# and so on or CK45, CK60, MO 40, ST 32 and ST 55.
Billets Size: 6-12m
Pusher-type: hydraulic pressure system ,Mechanical car type.
2. Water system
a. Mould cooling water
Influent pressure: P≥0.9Mpfa
Influent temperature: ≤35℃
Influent effluent temperature difference: 6-10℃
PH:7.5-9
Water total hardness: ≤150mg/L
Flow: ≥240Nm3/h
b. Secondary cooling water
Hydraulic: P≥0.6Mpa
Impurity particle size: ≤0.2mm
Flow: ≥80Nm3/h
c. Machinery cooling water
Hydraulic: P≥0.6MPa
Impurity particle size: ≤0.5mm
Flow: ≥40Nm3/h
3. Gas System
a. Oxygen
Pressure: P≥0.9Mpa
Purity: ≥99.5%
Flow: ≥4Nm3/min
b. Gas
Pressure: P ≥0.3MPa
Combustion value: ≥93700KJ/m3
Flow: ≥1.5Nm3/min
c. Compressed air
Pressure: P ≥0.5MPa
Flow: Q≥5Nm3/min
Withdrawal straightening machine
Power: 11KW/set
Rated revolution: 1500/min
Billet withdrawing force(max): 11000N
Straightening force (max): 220000N
Tension speed range: 0.3-3.0m/min
Dummy bar speed (max): 3.99m/min
4. Central hydraulic station
System pressure: P≥8.0MPa
System flow: Q=37.5L/min
Ⅱ. Supply cope
1. On-line equipment list
No |
Equipment name |
Unit |
Qty. |
Remark |
---|---|---|---|---|
1 |
Ladle Rotor Tower
|
set |
1
2
|
45000USD/set Double arm 100ton support each
26000USD |
2 |
Tundish moving car 15000USD/set |
PCS |
2 |
30000USD |
3 |
Tundish 4600USD/set |
PCS |
2 |
9200USD |
4 |
130sq.mm Or 150X150MM 5500USD/set |
PCS |
2 |
11000USD |
5 |
Mould cover 400USD/set |
SETS |
2 |
800USD |
6 |
Oscillation device(completed leaf )30000USD/set Oscillation device( Half Leaf) (operational) 15000USD/st |
SETS |
2 |
60000USD Complete leaf spring oscillation table( Advance technology,almost no wear and tear ,long working time,top quality) Main parameter Oscillation frequency: 10~280/min Amplitude: 2.5~6 mm
30000USD |
7 |
Secondary cooling manifold (stainless steel) and support 1500USD/set |
SETS |
2 |
3000USD |
8 |
Guide section for secondary cooling7000USD/set |
SETS |
2 |
14000USD/set |
9 |
Cutting Machine21000USD/set |
SET |
2 |
42000USD |
10 |
Withdrawal straightening machine51000USD/set |
SETS |
2 |
102000USD |
11 |
Dummy bar |
PCS |
2 |
2setsx 6200USD =12400USD |
12 |
100sq or150sq Dummy head and transition head |
SETS |
2 |
|
13 |
Dummy bar guide wheel |
SETS |
2 |
|
14 |
Dummy bar storage device |
SETS |
2 |
2sets x 6000USD =12000USD |
15 |
Dummy bar heat protetion cover |
PCS |
2 |
|
16 |
Roller table before cutting 6200USD/set |
Group |
2 |
12400USD |
17 |
Transmit roller table 15000USD/set |
Group |
2 |
30000USD |
18 |
Discharge roller table 14500USD/set |
Group |
2 |
29000USD |
19 |
Transverse pusher11000USD/set |
SET |
1 |
11000USD |
20 |
Cooling bed 20000USD/set |
SET |
1 |
Machinery Moving car |
21 |
Overflow chute 400USD/set |
PCS |
4 |
1600USD |
22 |
Hydraulic station system 20000USD |
SET |
1 |
20000USD |
23 |
Cooling water distribution system 10000USD/set |
SETS |
2 |
20000USD/set |
24 |
Electrical system50000USD/set |
SETS |
1 |
50000USD/set |
a |
Power supply conbinet |
SET |
1 |
|
b |
Frequency conbinet |
SETS |
2 |
|
c |
PCL conbinet |
SET |
1 |
|
d |
Main operating table |
SET |
1 |
|
e |
Suspension operating box |
SETS |
2 |
|
f |
Small operating box |
SETS |
2 |
|
27 |
Steel construction platform |
Batch |
1 |
750000USD |
a |
Main operating platform |
|
|
|
b |
Temperature test platform |
|
|
|
c |
Dummy bar storage platform |
|
|
|
|
|
|
|
|
|
|
|
|
|
2、Auxiliary equipment
No. |
Equipment name |
Unit |
Qty. |
Remark |
|||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
Water pipe, connector valve .etc |
Batch |
1 |
20000USD(For CCM self connection(not for equipment connection.) |
|||||||||||||||||||||||||
2 |
Various cable,tube.etc |
Batch |
1 |
||||||||||||||||||||||||||
|
|
|
|
|
|||||||||||||||||||||||||
|
|
|
|
|
|||||||||||||||||||||||||
5 |
Level control system 30000USD/set (Operational) |
Sets |
2 |
Red ray type |
|||||||||||||||||||||||||
6 |
Electromagnetic mixing 35000USD/set(Operational) |
sets |
2 |
|
|||||||||||||||||||||||||
Auxiliary equipment (operational)
|
|||||||||||||||||||||||||||||
Following is Discount price: |
2. Lead time: 120 days
4. Term of payment: 40% advance payment by T/T, 60% balance payment by T/T before date of shipment
5. Customer service: All the costs of seller’s experts go and work at abroad for return air tickets, accommodation and meals, will be borne by the buyer. The buyer shall compensate the experts at USD 150 per engineer per day for debugging period. After normal operation the seller should be responsible to guarantee repair or change of the faulty components in 6 months, such as master control board, reactor, compensate capacitor, hydraulic device, breaker, and furnace shell (except for lining break through, stoppage or shortage of cooling water supply for components).
Delivery by 1 piece 40’FR frame container, 2piece 40HQ container,5 pieces 40GP container+bulk for ladle rotor tower.